PROJECT DETAILS
Apartment on Moscow Avenue
Walls & Ceilings (plastering, painting)Partition Walls (drywall, block)Electrical & Lighting

For the ceiling, I first built a frame from metal studs, then boarded it with drywall, taped the joints and skimmed it smooth.
I ran the lighting cables through the ceiling levels in advance and prepared the walls for the final finish.
Duration
26 days
Location
Moscow Avenue, Tbilisi